top of page

Enclave at Redwood

CATEGORY

Low Density Multifamily Development

SQUARE FOOTAGE

398,288 sf

LOCATION

Fort Collins, CO

STATUS

In Progress

In terms of square footage and total number of buildings, Enclave at Redwood was our largest project yet, and included its own challenges apart from its scale. Keeney Design was hired to finish the design and construction documents and provide construction administration for the duration of the project. Comprising 18 unique building designs, 44 total structures, and including 238 residential units, this was a significant project for us to complete in the time allotted for design.

​

Among the challenges that we had to overcome on this project were adhering to the exterior design of the buildings as they were entitled, finding solutions to problems we and the client had identified that were left unresolved prior to our involvement, and provide a cohesive set of drawings that our client was able to use to bid, build, and complete their vision for the development.

​

The project is currently under construction (as of November 2026) and is slated for completion in May of 2027. 

Cover Rendering_UPDATE_edited.png
22-077 - DHIC Enclave at Redwood (Fort Collins)_edevrient_edited.jpg
bottom of page